- Philstar.com
- The Philippine Star
- Pilipino Star Ngayon
- The Freeman
- Pang-Masa
- Banat
- Interaksyon
- Coupons
SUPPORT PHILSTAR
About Us |
Contact Us |
Advertise |
Privacy Policy |
Member Agreement |
Copyright Notice
Copyright © 2026. Philstar Global Corp. All Rights Reserved
X
+ Follow CABULIG Tag
Array
(
[results] => Array
(
[0] => Array
(
[ArticleID] => 320096
[Title] => First Gen unit, Cepalco tie up for hydropower proj
[Summary] => Cagayan Electric Power and Light Co. (Cepalco) and First Gen Renewables Inc. (FGRI) are joining forces to engage in hydropower development project in Mindanao.
Documents show that Cepalco and FGRI are planning to develop the eight megawatt (MW) Cabulig mini hydroelectric power plant in Claveria, Misamis Oriental.
The Cabulig hydropower facility is intended to supply power to Cepalco.
The project will include an eight-kilometer transmission line that would connect the plant to a 69-kilovolt Cepalco distribution line in Jasaan town.
[DatePublished] => 2006-02-05 00:00:00
[ColumnID] => 133272
[Focus] => 0
[AuthorID] => 1096364
[AuthorName] => Donnabelle L. Gatdula
[SectionName] => Business
[SectionUrl] => business
[URL] =>
)
)
)
CABULIG
Array
(
[results] => Array
(
[0] => Array
(
[ArticleID] => 320096
[Title] => First Gen unit, Cepalco tie up for hydropower proj
[Summary] => Cagayan Electric Power and Light Co. (Cepalco) and First Gen Renewables Inc. (FGRI) are joining forces to engage in hydropower development project in Mindanao.
Documents show that Cepalco and FGRI are planning to develop the eight megawatt (MW) Cabulig mini hydroelectric power plant in Claveria, Misamis Oriental.
The Cabulig hydropower facility is intended to supply power to Cepalco.
The project will include an eight-kilometer transmission line that would connect the plant to a 69-kilovolt Cepalco distribution line in Jasaan town.
[DatePublished] => 2006-02-05 00:00:00
[ColumnID] => 133272
[Focus] => 0
[AuthorID] => 1096364
[AuthorName] => Donnabelle L. Gatdula
[SectionName] => Business
[SectionUrl] => business
[URL] =>
)
)
)
abtest
By Donnabelle L. Gatdula | February 5, 2006 - 12:00am
Recommended
Civil society groups yesterday expressed serious concern over the reported plan of the new Senate majority to designate Sen. Francis “Chiz” Escudero as presiding officer in the impeachment trial of Vice President Sara Duterte.
6 hours ago
The ball has started rolling ahead of the July 6 start of the impeachment trial of Vice President Sara Duterte, with both defense and prosecution panels facing each other at yesterday’s pre-trial conference at the Senate.
1 day ago
Only a small percentage of Filipinos believe that senators would decide based on evidence and the law rather than political considerations in the upcoming impeachment trial of Vice President Sara Duterte, according to a survey conducted by the OCTA Research group.
1 day ago
“Do we expect a deja vu or do we expect a different behavior on the part of Senator Chiz?”, a political analyst asked.
1 day ago
President Ferdinand Marcos Jr. held bilateral talks with Russian President Vladimir Putin in Kazan on Wednesday, June 17, as Southeast Asian leaders gathered for a summit aimed at strengthening ties between Russia and ASEAN.
1 day ago
Lotto Jun 19, 2026
EZ2/LVM - 8 31
SUERTRES - 3 7 2
4D LOTTO - 0 3 8 0
6/45 Mega Lotto - 27 15 9 13 12 8
P69,223,289.00
Grand Lotto - 43 53 8 45 20 11
P128,000,000.00
Forex
February 12, 2018
- 12:00 am
- 12:00 am
1$ : P51.66









